Status: Stages 1–4c delivered. Both 4c wirings are in production: the continuation loop
(task/continue, ADR-0047) and the observation/disclosure path (ADR-0048).
Header, counts and the sections touched by the 2026-10-23/24 remediation were
re-measured against main at e0f6784 (tree 52bc70da), the merge of PR #11.
The latest full local gate run is 2054 run, 2054 passed, 0 failed, 6 skipped
(cargo nextest run --workspace, as run by gate G9; a "leaky" count varies between runs
and is process accounting, not a test failure). The boundary-gate self-tests are
181 (all 181 boundary-gate self-tests pass), and G12 remains a documented
skip because no release tag is available.
CI has six jobs (see §8), and a hosted run is recorded against this exact tree:
run 44121245140
on e0f6784, all six jobs green, G9 1898 run, 1898 passed, 116 skipped. The 116 are
the ADR-0046 scope exclusions on a hosted runner that cannot isolate — the hosted run is
not evidence about the Tier-1 sandbox suites. Gate G9 does not accept a
cargo test --workspace run as equivalent; the old "1652"/"1655"/"2001" counts are stale.
main is protected: six required status checks, strict, pull request required, no
force pushes or branch deletion, merge commits the only merge method.
V-68 is closed, not open: A-040 diagnosed it (the fixture claimed 12 tasks against a
concurrency budget of 8 and depended on a non-atomic check), and A-041 closed the separate
engine defect that diagnosis exposed. PRs #4–#8 are merged with their original history
preserved. The historical v95_concurrency failure under load has no new occurrence in
these records. See §8.
OpenRayNux is a local-first personal AI operating layer: one long-lived Rust process owning the user's time, data and integrations, with several surfaces driving the same governed capability set. One surface ships today.
The foundational principle: The model proposes; a deterministic engine disposes. The LLM is never the security authority, the scheduler, the credential authority, the transaction authority, or the final arbiter of whether an action succeeded.
A working, governed execution core — not a finished AI OS.
| Workspace | 17 Rust crates, 1.98.1, gate-enforced dependency direction |
| Storage | SQLite (bundled, ≥ 3.51.3), schema at v15 (CURRENT_VERSION, migration.rs:510), snapshot-protected migrations |
| Task engine | Durable, hand-rolled; passes all 12 ADR-0029 properties from a second test binary |
| Governance | 9-stage dispatcher; CapabilityInvocation cannot be constructed outside orxnud-policy |
| Audit | Append-only, hash-chained, durable, survives restart |
| Approvals | Single-use, digest-bound v3, time-boxed, bound to an approver and a logical step |
| Sandbox | Tier-1 execution under bubblewrap; cgroup v2 ceilings where the host delegates |
| Transport | JSON-RPC 2.0 over a 0600 Unix socket, protocol version 1, 18 methods |
| CLI | orxnuctl — hand-written parser, 5 verb groups |
| TUI | orxnu-tui — narrow Ratatui slice; daemon status, tasks, preview, approval, execution |
| Daemon | orxnud — composition root, single-instance endpoint, serves the socket |
| Provider | One real HTTPS provider, TLS with chain and hostname verification |
| AI | A real proposer: registry-derived menu → model → durable proposal → approval → governed execution |
Three shipped capabilities are declared and granted independently of adapter registration.
AdapterRegistry::shipped(workspace) in crates/orxnud-capability/src/dispatch.rs always
registers text/word-count; it registers filesystem/write-text when the orxnud-fswrite
helper resolves, and registers filesystem/read-text when that same helper path resolves,
deriving the orxnud-fsread path without independently validating it. If orxnud-fswrite
cannot be resolved, both filesystem adapters are omitted and dispatch refuses those
capabilities with NoImplementation.
Only text/word-count runs without an approval in the shipped build:
orxnuctl capability run --capability text/word-count \
--params '{"text":"hello world"}' # Low, Tier 0, in-process, no promptfilesystem/read-text is High, Tier 1, and requires a single-use approval. filesystem/write-text
is also High and Tier 1, but the shipped build refuses it by default, even with a valid
approval:
APPROVAL=$(orxnuctl capability approve \
--capability filesystem/write-text --target notes.txt \
--params '{"path":"notes.txt","contents":"hello"}' --ttl-ms 60000)
orxnuctl capability run --capability filesystem/write-text \
--target notes.txt --params '{"path":"notes.txt","contents":"hello"}' \
--approval "$APPROVAL"
# refused: argv_payload_exposure_refused; nothing is writtenThe refusal is deliberate: ADR-0054 Decision 7 keeps the payload-bearing capability disabled
until R-1's evidence conditions are met. It is enforced at dispatch before any process exists,
and an approval does not lift it. There is no operator configuration or environment variable
that enables it; the test-only exception (with_argv_payload_exception_for_this_process) is not
reachable from the shipped CLI. The capability remains registered so its declaration, policy and
refusal stay visible and testable.
An approval is bound to the exact parameters it was issued for. Presenting it with
contents changed is refused approval-digest-mismatch before anything runs. This binding is
part of the governance path; it is not a substitute for the separate default refusal above.
The full AI loop, through the shipped binaries:
orxnud --state-root "$ROOT" --provider-base-url https://api.groq.com/openai/v1 \
--provider-model openai/gpt-oss-120b &
orxnuctl task create --id t1 "write notes.txt"
orxnuctl task claim --id t1 --worker ai
orxnuctl task ai-propose --task t1 --worker ai # model picks a capability from the registry
orxnuctl capability approve --proposal <id> --ttl-ms 60000
orxnuctl task execute --proposal <id> --worker ai # governed; write-text is refused by defaultThe model may propose filesystem/write-text, but the shipped build refuses it with
argv_payload_exposure_refused, so that loop demonstrates the governed refusal rather
than a completed write. A successful Tier-1 execution needs a reviewed read-text
proposal.
- Authority cannot be forged from data.
CapabilityInvocationdoes not deriveDeserialize; its constructor demandsorxnud-policy's private seal. A compile-fail test with a recorded.stderrproves re-adding the derive breaks the build. - One route out.
Dispatcher::dispatchis the only path from an authorised intent to an effect. ASubprocessadapter has no in-process implementation: the shipped adapters'invokereturns an error rather than performing the effect, and the governed-path test adapter panics if the route is bypassed, so a bypass is loud rather than silent. Gate G2 rejectsCommand::newanywhere inorxnud-capability. - Fail closed, everywhere. A host that cannot establish the required guarantees refuses
every Tier-1 capability — before a credential resolves, before a process exists. There is
no unsandboxed fallback and no
BestEffortpath in the governed route. - Approvals mean consent. Digest v3 binds the approver, their authority root, the proposer, capability, target, canonical parameters, time bounds and the logical step. One consent cannot cover a sibling step, and the durable proposal records the model that actually answered rather than a configured name.
- Credential hygiene is tested, not asserted. A sentinel value runs through every path that touches the provider key — resolved, refused, debugged, redacted, persisted — and its exact bytes are asserted absent from all of them, including every file under a real daemon's state root.
- TLS cannot be downgraded.
Scheme::carries_credentialsis true only for TLS, redirects are not followed, and eleven tests drive a realrustlshandshake.
| Linux | Windows | |
|---|---|---|
| Compiles | ✅ | ✅ all 16 crates, MSVC, all targets |
| Behaviour tests run | ✅ | ✅ platform-neutral suites, on a real runner |
| Tier-1 sandbox | ✅ where the host provides guarantees | ❌ refuses — no backend exists |
| Isolation proven | ✅ mutation-verified (V-46) | ❌ NOT PROVEN (V-29) |
The Windows entries record the audit-baseline evidence; no hosted Windows run is recorded against this worktree. Windows is neither "untested" nor "sandbox-supported". It is portable and compiled, with isolation unproven: there is no Job Object or AppContainer backend, so a Tier-1 execution is refused rather than degraded. Refusing is correct — an unsandboxed Tier-1 subprocess is worse than no capability at all.
The pinned GitHub-hosted Linux CI image cannot produce positive Tier-1 sandbox evidence.
On ubuntu-24.04 the runner cannot create an unprivileged user namespace (Ubuntu 24.04+
kernel.apparmor_restrict_unprivileged_userns), and a container does not escape it either.
That is measured and printed on every run. The sandbox-integration job reports the
limitation rather than weakening anything to hide it — see §6. The boundary of that
statement (measured 2026-11-08): it is the image that cannot isolate, not hosted CI as a
class — a hosted ubuntu-22.04 image establishes the production Tier-1 posture on the host
itself. The Tier-1 suites have not been run there, so there is still no positive Tier-1
evidence in CI.
The 4c governance core and both of its wirings are delivered. What remains unwired is the surfaces listed last, and nothing else.
- Continuation is wired.
task/continuecrosses a step boundary by claiming one step and proposing the next through the ordinary approval gate (ADR-0047).claim_next_step()is called fromorxnud-daemon's runtime, not only from tests — seeruntime.rs, thecontinue_taskhandler. A multi-step task still stops at the boundary until somebody asks it to continue, which is the designed behaviour rather than a gap (ADR-0043, V-84). - Observation/disclosure is wired. An approved, verified read informs one
subsequent proposal, to the
(endpoint, model)identity that asked for the read, and only across the immediately following step.PriorStepContextis untouched and stays metadata-only — the content travels on a separate, ephemeral channel that is consumed on release and never becomes durable (ADR-0048, V-88). This is the first path in the build on which workspace content can leave the machine, and3c8a413names itself the rollback point immediately before that happens. - An earlier version of this section claimed both of the above were absent — that
claim_next_step()had "nothing in production calls it", and that the runtime "does not read or write" the observation store. Both statements were true when written and are now false, and they contradicted §3 of03-system-architecture.md, which already described the 4c governance core as delivered with both wirings. They are corrected here rather than left to contradict a normative document. - The scheduler is wired.
TaskService::tickandnext_wakeup_mshad no production caller andScheduler::add_schedulehad no route at all, so no schedule could be registered and the timer had nothing to fire. Both are now live:schedule/createandschedule/listare reachable throughorxnuctl schedule add|list, and the daemon's own event loop runs a bounded pass when the engine's next occurrence is due — re-reading the deadline each pass, so a schedule created after the timer was armed takes effect at once rather than waiting out the old one. A due occurrence is now created with no request arriving. Evidence:crates/orxnud-daemon/tests/serve_lifecycle.rs. - Connections are served concurrently, with bounds. Each is its own task, under a
connection ceiling and a frame-read deadline;
daemon/statusanswers from a composition snapshot and takes no governed lock, and neither model route holds that lock across the provider's network round trip. Before this, one peer that opened a socket and never finished a frame prevented every other client from being served — reproducibly, and indefinitely. Seecrates/orxnud-daemon/src/serve.rs. - Still not fixed, and recorded rather than hidden: a Tier-1 dispatch holds the
governed lock across the sandbox execution (up to 10 s), because
Dispatcher::dispatchis a synchronous function that settles its own audit obligation internally and offers no seam at which the lock could be released mid-effect. A request that needs durable state therefore still queues behind an in-flight sandboxed write. Narrowing that is a change to the dispatcher, not to the transport. - A narrow
orxnu-tuinow exists: a Ratatui client that reusesorxnuctl's transport and shows daemon status, task listing and inspection, read-only proposal preview, approval and execution, withNeedsVerificationrendered as unresolved rather than success. It holds no policy, storage or domain rule. Deeper inspection (proposal listing, execution history) is the remaining TUI work for the 2026-11-30 MVP. - Also absent: no GUI or Tauri application, no MCP surface, no messaging, no local ASR/TTS, no general shell capability, no unrestricted filesystem capability, no Windows sandbox backend, no actor runtime beyond the local authority model.
2054 tests run, 2054 passed, 0 failed, 6 skipped in the latest full local gate on
e0f6784, with a varying leaky count. The leak detector reports processes that outlive
their test; the count varies between runs and is not a test failure. All 6 skips are
#[ignore]d child-process entry points, not tests. A hosted run is recorded against
this exact tree (44121245140):
all six jobs green, G9 1898 run, 1898 passed, 116 skipped. On a hosted runner that
cannot isolate, gate G9 excludes the Tier-1 sandbox-evidence suites and prints which it
excluded and why — those 116 exclusions are not evidence about the sandbox.
Two caveats that a green run does not carry, found 2026-10-10. The enforcement and
resource suites println! and return when the host cannot delegate cgroups
(crates/orxnud-platform-sandbox/tests/enforcement.rs:119-126), which is a pass to
nextest and to gate G9, and no gate reads the reason. One isolation test,
a_socket_bound_in_the_namespace_is_unreachable_from_the_host
(tests/isolation.rs:374), returns early and skips its own assertion when the helper's
bind succeeds inside the netns — which it does on a host that can create a user
namespace. On the host this repository was measured on, that is exactly what happened.
A green CI run proves: the numbered gates G1–G17 plus the G2d sub-gate are exercised on Linux (G12 is skipped without a release tag); every crate compiles for MSVC; the platform-neutral suites behave on real Windows; the portable core is portable; and on a host that cannot isolate, a Tier-1 capability is refused with the missing guarantee named.
It does not prove that a Tier-1 capability executes under isolation.
governed_path, read_text_real, write_text, isolation and the sandbox suites are
positive evidence only on a host that can create an unprivileged user namespace — a
developer machine (scripts/run-sandbox-tests.sh --host) or a container on such a host.
Two claims that look like guarantees and are not:
- Positive hosted Tier-1 isolation evidence does not exist. A green
sandbox-integrationmeans the environment was measured, not the sandbox was proven. - V-75 is live-run evidence. A real Groq
openai/gpt-oss-120bproduced and executed a governed proposal. No gate performs that run and none can — it needs a live credential. Everything around the model call is CI-covered; the model's contribution is not.
V-96 is recovered, not missing. This section previously said otherwise, and it was
wrong. Verification work was carried out under V-93, V-94, V-95 and V-97, all in main.
This document then reported a gap at V-96 and stated that "no definition of V-96 exists
anywhere in the repository: not in docs/, not in the register, not in the commit history,
not in the tree." All four of those loci were checkable, and all four were wrong.
A definition existed the whole time, in
08 §"Platform boundary", row cfg(target_os) gate:
V-96 is that gate G3 matched raw text, so a comment could switch it off and seven of
nine cfg spellings — every nested one — were invisible. The fix is implemented: commit
7bf9da8 "test(ci): drive the boundary gates against adversarial rewrites" added
scripts/rustscan.py's lexical classifier and scripts/gate-selftest.py, which drives the
real scripts/ci-gates.sh over temporary fixture trees. Commit b73246d cites it again.
The register and this section both asserted an absence that was contradicted by the file
they were describing. That is the failure mode the register's own freshness policy exists
to catch, produced by a reconciliation. The register row is now rewritten from recovered
evidence and is marked partially fixed, because G3 still matches platform-API paths
literally and is defeated by use std::env::consts as host; … host::OS — a real residual
bypass, recorded rather than closed over.
So the next engineering milestone is no longer "define V-96". The previous four-step
plan was built on a false premise and withdrawn; the current order was decided after PRs
#4–#8 landed and main went green and protected:
- Documentation reconciliation — landed (PR #9). That PR reconciled this index
against
b069595without touching the protected audit documents; this snapshot has since been re-measured againste0f6784after the F-26b record (PR #10) and the TUI (PR #11). - F-26b investigation — re-establish the restore/checkpoint failure sequence against
the current source, define the recovery invariant, and design deterministic
failure-injection tests. A focused investigation first, not an implementation; kept
separate from S-11, F-26c and S-31. See
docs/12F-26b. - TUI vertical slice — first slice landed. The narrow Ratatui client is in the tree
(ADR-0060): daemon status, task listing and inspection, read-only preview, approval and
execution, and a visible
NeedsVerificationstate. No policy, storage or domain logic in the surface. Remaining: deeper inspection before the 2026-11-30 MVP. - Remaining F-26 / S-11 / S-31 review — establish the release safety boundaries.
The enforced constraint is that another extended round of verification-infrastructure work
must not consume the MVP time: the next milestone has to demonstrate that a human can use
the governed system through its required interface. The other candidates above remain
recorded in docs/12 but are not the decided order.
Current tree (e0f6784, tree 52bc70da): six jobs — Linux gates (G1-G17 + G2d),
Windows cargo check (nightly), Windows portability tests,
Tier-1 sandbox (production configuration), cgroup resource enforcement (delegated),
Portable core builds for wasm32. Hosted evidence on this exact commit:
run 44121245140,
all six jobs green, G9 1898 run, 1898 passed, 116 skipped. main is protected
with all six checks required, strict, pull requests required, and no force pushes or
branch deletion. The history below is preserved.
V-68 is closed, with two distinct records: A-040 diagnosed the fixture-observation
failure (12 claimed tasks against a budget of 8, with the extra claims slipping past a
non-atomic check — the tasks were never lost, they stayed pending), and A-041 closed the
engine defect it exposed (max_concurrent_leases is now checked inside the claim's own
BEGIN IMMEDIATE, on the generic and targeted paths). PR #7 and PR #8 carry the two
fixes; the occurrence records in docs/12 were kept as written.
linux-gates passes on main as of c5934970. It did not, for a while, and the
failure mode was misleading enough to be worth recording.
Between 6224fa57 and 965a509 the lane was cancelled on three consecutive runs. It was
not failing on the code: it reached G9: tests and was killed there having produced zero
test results, which places the death in the cold workspace compile rather than in any test.
A cancelled lane reports nothing about the code at all, and next to four green lanes it
reads as though five things had been verified.
The cause was our own reproducibility work. a1c0b2e pinned the four gate tools to exact
versions, which is right, but installed them with cargo install … --locked — and that
compiles each tool from source on a cold runner, before any project test can start, against a
timeout-minutes: 15 budget. Fixed in three steps: install from prebuilt upstream binaries via
taiki-e/install-action pinned to a full commit SHA with fallback: none (6bc2d44); correct
cargo-nextest to 0.9.146, the ceiling of that action's manifest rather than the upstream
release feed (965a509); raise the job timeout to 30 minutes as headroom, explicitly the
second line rather than the fix.
Run the gates is now green: all selected gates passed, nextest 1505/1505. The
tool-install problem is resolved.
Run 37916621851 at c5934970 failed at G9 on
orxnud-task::v95_concurrency::recovery_racing_a_claim_leaves_exactly_one_owner:
recovery was told the database was busy rather than what it settled:
sqlite error: database is locked
A later run of the identical commit is green. 37919194011, same SHA c5934970, all five
jobs succeeded, all selected gates passed, and all 13 v95_concurrency tests passed
individually — including the one above. So the lane is not deterministically broken, and
whether a given push is red on G9 is currently a coin-flip.
Reproduced locally only under artificial load: 0 failures in 25 runs unloaded, 9 in 30 with
the box CPU-saturated. The observed error is SQLITE_BUSY_SNAPSHOT (extended code 5) at
BEGIN IMMEDIATE, which is returned immediately by SQLite when a write transaction cannot
upgrade its snapshot; a busy_timeout or busy handler does not absorb it.
No root cause is established and no fix exists. The working hypothesis is a defect in the
test's own race() fixture rather than in production code — it installs a busy handler and
assumes that is sufficient — but that has not been proven, and an edit attempted on
2026-10-08 was reverted because a controlled comparison showed it changed nothing (10/30 under
load versus 9/30 for the unmodified binary). Recorded here as an open defect with its
reproduced symptoms, not as a diagnosed cause. It is invisible locally on an idle machine,
which is exactly the property that makes it worth writing down.
Windows cargo check (MSVC), Windows portability, Portable core builds (wasm32) and
Tier-1 sandbox all pass on e0f6784 — hosted run
44121245140, six for
six. G12 is skipped for want of a release tag to compare against. Local: 2054/2054, and
CI=true ./scripts/ci-gates.sh passes end to end in about 27 seconds on a warm target
directory.
| # | Document | What it is for |
|---|---|---|
| 03 | System Architecture | Start here. The shape, the crate graph, the 9 dispatcher stages, §9a: where the implementation actually stands, and §10: the verifier-admission invariant (K.1). |
| 12 | Verification Register | The highest-leverage file. 109 rows (107 V rows plus K.1 and F-26): every claim that can become false, its verification source, its review trigger, and the consequence of drift. |
| 09 | Architecture Decision Records | 57 primary ADRs, ADR-0001…ADR-0059 (0041 and 0042 deliberately unused; ADR-0050 also carries an amendment, and ADR-0058 carries three implementation notes, none of which are separate records). Evidence, trade-offs, rejected alternatives, revisit conditions. |
| 07 | Extension & Capability Model | The dispatcher order, the declaration structure, parameter schemas, target semantics, and the real registry. |
| 04 | Security & Threat Model | Normative. Trust boundaries, threats, controls — and §5a: the threats Stage 4c and the CI work introduced. |
| 06 | Deployment & Platform Model | Profiles, the platform boundary, and §2.3: the honest per-platform assessment. |
| 08 | Testing & Engineering Standards | §19: what CI actually enforces, the real baseline, and what a green run does not prove. |
| 04→ | Critical Review | The adversarial section. What we assume, what is deliberately minimal, what we must never build. |
| 00 | System Requirements | What it must be. A research record. |
| 02 | Technology Evaluation | The decision table and licence posture. A dated evaluation. |
| 01 | Architecture Research | What the ecosystem looks like, and corrections to widely-repeated claims. |
| 05 | Resource & Performance Model | Budgets. All unmeasured — see the correction in its header. |
| 10 | Open Questions | Live questions, plus preserved resolved answers. Six reconciled 2026-10-05. |
| 13 | Phase 1 Contract | Historical. The agreement Phase 1 was measured against. |
| 14 | Phase 2 Contract & Delivery Record | Historical. Durability, the engine, measured synchronous = FULL. |
| 15 | Phase 4a Record | Historical. The verified execution boundary, including the V-45 measurement correction. |
| sources.md | Sources | Version claims with URLs and access dates. |
| Area | Decision | ADR |
|---|---|---|
| Core language | Rust | 0001 |
| Desktop | Tauri 2, optional separate process — future | 0002 |
| Local transport | Unix socket + JSON-RPC 2.0; named pipe future | 0003 |
| Runtime | Tokio + an explicit supervisor | 0004 |
| Frontend | Svelte 5 + Vite 8 — future | 0005 |
| Storage | SQLite via rusqlite, bundled ≥ 3.51.3 |
0006 |
| Task engine | Hand-rolled durable task table | 0007 |
| Vector search | None. FTS5 now; interface exists | 0008 |
| Capabilities | Three isolation tiers, no dynamic plugins | 0009 |
| MCP | External, untrusted integration boundary only | 0010 |
| LLM abstraction | Provider-neutral, one real adapter | 0011 |
| Determinism | Model proposes; engine disposes | 0012 |
| Authority | CapabilityInvocation is not deserialisable |
0034 |
| Tier-1 execution | PID namespace + PDEATHSIG, and what it does not do |
0035 |
| Tree lifetime | The PID namespace is load-bearing; cgroup.kill is a backstop |
0036 |
| Approvals | An approval names its approver, and the digest binds them | 0037 |
| Proposals | Durable before approved; a lease never grants authority | 0038 |
| Parameters | A capability declares them; the proposer reads the declaration | 0039 |
| Provider | One real provider over HTTP, credential in the secret store | 0040 |
| Continuation | An explicit operation, not a widened claim | 0043 |
| Observation | Governed reads; a context that carries no content | 0044 |
| Disclosure | One approval, two acts, bound to (endpoint, model) |
0045 |
| CI boundary | A missing guarantee is a refusal to assert, not a skip | 0046 |
The full table of all 58 primary ADRs is in 09-decisions.md.
| ID | Question | Status |
|---|---|---|
| 🔴 Q-OPEN-01 | Telegram ToS §1.5 — legal review | Open, deliberately not blocking. No messaging code exists; the boundary it would protect is enforced at the read layer instead. |
| 🟡 Q-OPEN-21 | Do TS6 and --tsgo diagnostics agree? |
Open; a frontend deliverable, and there is no frontend yet |
| 🟡 Q-OPEN-05 | Model cost ceiling: per-provider or per-user? | Open — one provider ships, so the question is not yet forced |
| ✅ Q-OPEN-17 | Is synchronous = FULL affordable? |
RESOLVED — ~2.3 ms/commit. V-30 |
./scripts/ci-gates.sh # numbered gates G1–G17 plus G2d; ~3 min
./scripts/preflight.sh # what THIS host can actually isolate
./scripts/preflight.sh --require # fail unless it is the production configuration
scripts/run-sandbox-tests.sh --host # the Tier-1 suites, on a capable host
scripts/run-resource-tests.sh # cgroup enforcement, in a delegated containerLast research/verification date: 2026-11-17 (index reconciled against main at
e0f6784, hosted run 44121245140).